Wednesday, December 17, 2025
  • Login
Dejoy Media Online
  • Home
  • Politics
  • Business
  • Entertainment
  • Lifestyle
    • Sports
    • Fashion
    • Food
    • Health
    • Travel
    • Entrepreneurship
    • Religion
    • Education
    • Security
    • Story
    • Others
  • World
  • Royalties
  • Weird but True
  • My account
No Result
View All Result
  • Home
  • Politics
  • Business
  • Entertainment
  • Lifestyle
    • Sports
    • Fashion
    • Food
    • Health
    • Travel
    • Entrepreneurship
    • Religion
    • Education
    • Security
    • Story
    • Others
  • World
  • Royalties
  • Weird but True
  • My account
No Result
View All Result
Dejoy Media Online
No Result
View All Result
Home Others

Power generation rises in 48 hours, hits 4,864MW

Admin by Admin
November 3, 2022
in Others
A A
0
Power generation rises in 48 hours, hits 4,864MW
Share on FacebookShare on TwitterShare on Whatsapp

Power generation on the national grid increased by 834.8 megawatts between Monday and Wednesday morning, hitting a high of 4,863.7MW at 6am on Wednesday.

Data obtained from the Abuja headquarters of the Federal Ministry of Power showed that the grid recorded an off-peak power generation of 4,028.9MW on Monday, October 31, 2022.

People also readMust read

President Tinubu commends Nigeria’s Armed Forces for protecting democracy in Benin Republic

PRESIDENT TINUBU NOMINATES GENERAL CHRISTOPHER MUSA AS THE NEW MINISTER OF DEFENCE

“The whereabouts of the terrorists are known but ‘Our bombs cannot reach them” …The BBC INTERVIEW THAT GOT THE DEFENSE MINISTER INTO TROUBLE

OONI OF IFE AND ALAAFIN OF OYO REAFFIRM UNITY AND PEACE IN YORUBA-LAND IN HISTORIC MEETING

The energy generated on Monday was put at 103,049.22 megawatts-hour, while what was sent out on the same day was 101.864.04MWh.

All the figures moved up on Tuesday, as both off-peak and peak power generation were 4,182.3MW and 4,803MW respectively.

Similarly, energy generated rose to 108,582.78MWh on Tuesday when compared to what was recorded the preceding day, as what was sent out on Tuesday also increased to 107,335.02MWh.

The northward movement in power generation continued on Wednesday. Data from the FMP showed that the grid boasted of 4,863.7MW as at 6am on Wednesday, indicating a growth of 834.8MW within about 48 hours.

Nigeria’s power grid has been characterised by series of fluctuations in electricity generation since this year, recording about seven system collapse in 2022.

But the Federal Government, through its Transmission Company of Nigeria, had repeatedly stated that it was making efforts to stabilise the grid through the construction of power substations across the country and other facilities. TCN manages the grid.

Analysts stated that the recent growth in power generation as witnessed on the grid could be a sign progress was being recorded by TCN in the deployment of transformers and other electricity transmission facilities across the country.

The company, for instance, recently announced that it had successfully installed and energised a new 150MVA 330/132/33kV inter-bus transformer at Delta IV Transmission Substation, Ughelli, Delta State.

It said the inauguration of the new 150MVA power transformer had restored the capacity of the substation by 132MW.

“Consequently, TCN is now able to evacuate/wheel more power for Benin Electricity Distribution Company to off-take from the substation for onward delivery to electricity consumers in Ughelli, Warri, and its environs,” the company’s General Manager, Public Affairs, Ndidi Mbah, stated.

She added, “The installation of the new 150MVA inter-bus transformer has restored flexibility to the substation by enabling TCN to evacuate power from Transcorp Power Limited at both at 330kV and 132kV voltage levels.

“This means an increase in bulk power transmitted through the substation and improved grid stability.”

The power firm also announced recently that it had begun the construction of a 132kV transmission line, a 2X60MVA transmission substation, and a switching station in Ekiti State to raise the state’s capacity by 204MW.

It further said the project was made up of a 50km stretch of 132kV transmission line from Ikere (Ado Ekiti) with a turn in – turn out at Ijesa Isu that terminated at Ilupeju Ekiti and had a 2X60MVA, 132/33kV transmission substation with four line bays.

Tags: Power
Share56Tweet35Share14Send
Previous Post

Union Bank gets $25m agric funding

Next Post

In Yorubaland, a king is not buried alive

Admin

Admin

RelatedPosts

President Tinubu commends Nigeria’s Armed Forces for protecting democracy in Benin Republic
Others

President Tinubu commends Nigeria’s Armed Forces for protecting democracy in Benin Republic

by riyi
December 8, 2025
0

President Bola Ahmed Tinubu has commended the gallantry of Nigeria's military on Sunday for responding swiftly to the request by...

Read more
PRESIDENT TINUBU NOMINATES GENERAL CHRISTOPHER MUSA AS THE NEW MINISTER OF DEFENCE

PRESIDENT TINUBU NOMINATES GENERAL CHRISTOPHER MUSA AS THE NEW MINISTER OF DEFENCE

December 2, 2025
“The whereabouts of the terrorists are known but ‘Our bombs cannot reach them” …The BBC INTERVIEW THAT GOT THE DEFENSE MINISTER INTO TROUBLE

“The whereabouts of the terrorists are known but ‘Our bombs cannot reach them” …The BBC INTERVIEW THAT GOT THE DEFENSE MINISTER INTO TROUBLE

December 2, 2025
OONI OF IFE AND ALAAFIN OF OYO REAFFIRM UNITY AND PEACE IN YORUBA-LAND  IN HISTORIC MEETING

OONI OF IFE AND ALAAFIN OF OYO REAFFIRM UNITY AND PEACE IN YORUBA-LAND IN HISTORIC MEETING

October 27, 2025
CYCLING KANO 2025: ORGANISERS LAUNCH ONLINE REGISTRATION AHEAD OF‎ DECEMBER EVENT

CYCLING KANO 2025: ORGANISERS LAUNCH ONLINE REGISTRATION AHEAD OF‎ DECEMBER EVENT

October 23, 2025
Load More
Next Post
  IN KOGI, IT IS RAINING WAHALA

In Yorubaland, a king is not buried alive

Please login to join discussion

Premium Content

LASG Initiates Removal of Perimeter Fences Near Drainage Channels in Ikoyi

LASG Initiates Removal of Perimeter Fences Near Drainage Channels in Ikoyi

October 30, 2023
Again, suspected herders kill 11 in Benue

Abducted bishop, wife, driver regain freedom

June 15, 2022
Growth or Development: A Planner’s View on Land Use Conversion Proposal in Ibadan By Prof Omoakin Jelili

Growth or Development: A Planner’s View on Land Use Conversion Proposal in Ibadan By Prof Omoakin Jelili

September 25, 2023
No Result
View All Result

CONTACT US

Publishers:

DEJOY MEDIA LIMITED  rc: 453792

 

Lagos Office:
GEM SUITE/DEJOY MEDIA LTD, 3RD Floor, Press House, 27, Acme Road, Agidingbi, Ogba-Ikeja, Lagos.

Ibadan Office:
Suite 27, PJ Square Complex, Beside NNPC Filling Station, Along Akala Expressway, Ayanla Ajanla, Ibadan.

Tel: 07016009534
08033049644
09041440392
07039755633

Mail: dejoymediaonline@gmail.com

© 2022 DEJOY MEDIA ONLINE. All Rights Reserved.

No Result
View All Result
  • Home
  • Politics
  • Business
  • Entertainment
  • Lifestyle
    • Sports
    • Fashion
    • Food
    • Health
    • Travel
    • Entrepreneurship
    • Religion
    • Education
    • Security
    • Story
    • Others
  • World
  • Royalties
  • Weird but True
  • My account

© 2022 DEJOY MEDIA ONLINE. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In